Before execution of the contract, Bonna Pressure Pipes’ design and engineering office helps customers to optimize their system and works with you for all the technical aspects.
During the performance of the contract, the design and engineering office works out all the technical documents required for the project. In particular:
– The bills of materials and piping arrangement drawings for the pipes and special fittings for manufacturing and for laying
– Detailed drawings of the equipment and/or accessories supplied
– Calculations notes
– The erection manual and instructions on the protection systems to apply on site