References BI


Vietnam - Ca Mau 1 & 2 750 MW Power Plant - 2006 & 2007


Client:Petrovietnam.
Installation: Torishima Japan
BONNA pipes and specials for the cooling system of the power plants Ø 2200 to 500mm, field testing pressure 7.2 bars.


Indonesia - Cilegon Power Plant - 2004
Client: Mitsubshi Heavy Industry (Japan)
Discharge line of the Cilegon power station. BONNA pipe Ø 3500mm. Working Pressure: 3 bars.


Singapore - Tuas Units 3 & 4 Power plant - 2003
Client: Mitsubishi
Tuas power station. Working pressure: 3 bars. Ø 2600mm to 1500mm of BONNA Pipes. Transition piece square to round 2500mm.


Vietnam - Phu My 2-2 Power Plant - 2002
Client: Electricite de France
Cooling system of Phu My 2-2 Power Station. Ø 1800mm BONNA pipes and fittings Ø 700mm. Working pressure: 4 bars.


Indonesia - PT. Rekayasa Industri - 2001
Stainless steel settlement compensator Ø 1400mm for Pokpa Site (Bontang, Indonesia).


Malaysia - Panglima Power Plant - 2001 & 2002


Owner: Panglima Power Snd Bhd
Engineering and Construction: Kita Tanega Sdn Bhd
Contractor: Siemens - Ballast Needam
BONNA pipe.
On shore: Ø 1800mm, 2000mm, 2500mm with internal pressure from 1 to 6 bars. Off shore: Strings of 3 pipes (design by BONNA) 4800 lm of BONNA pipes Ø 2500 & 2200mm.


Indonesia - Kaltim 4 - Fertilizer Plant (Bontang) - 2000
Owner: PT. Pupuk Kalimantan Timur
Engineering and Construction: PT. Rekayasa Industri
Sea water underground system: BONNA pipes
Ø 1500, 900, 800, 600, 500, and 400mm.
Working pressures: 7 bars (supply lines).


Indonesia - Merak (West Java) - 1998
Owner: PT. Stryrindo Mono Indonesia
Client: Mitsubishi Heavy Industries
Cooling Sea Water Lines: BONNA Pipe
Ø 900mm. Working pressure: 5 bars.


Indonesia - Sidoarjo Water Treatment Plant (East Java) - 1998
Owner: PT. Taman Tirta Sidoarjo
Raw Water Lines: BONNA pipes Ø 500 and 600mm.
Working pressure: 2 bars.


Indonesia - Misi Pulp Mill (Sumatra) - 1998
Owner: PT. Tanjung Enim Lestari
Client: Holland-Ballast-Thiess Joint Operation
Raw water lines: BONNA pipes Ø 900, 1100, 1500, and 2100mm.
Working pressures: 10 bars, 6 bars & 1 bar.
Indonesia - Amjos Ammonia Plant (Bontang) - 1998
Owner: PT. Pupuk Pasifik Amonia
Cooling Sea Water: One contract with PT. Rekayasa Industrim, one with Mitsubishi Heavy Industries. BONNA pipes Ø 1500 and 500mm.
Working pressure for supply line 7 bars, working pressure for the return line 3 bars.


China - Laibin Power Plant - 1997 & 1998
Client: Elictricite de France
2km of BONNA pipe Ø 2100mm.
Working pressure: 6,5 bars.


Indonesia - Popka Urea Plant Bontang
Cooling sea water lines for the Kaltim Urea Optimization Project.
Owner: Pupuk Kalimantan Timur.
Engineering and Construction: PT. Rekayasa Industri
Scope: 1750mm of BONNA pipes Ø 400, 600, 900, 1000, 1400, and 2200mm.
Working Pressure: 7 bars for supply lines and 3 bars for return lines.


Indonesia - Tanjung Jati B Power Plant, Jepara - 1997, 1998, 2003 & 2004
Contractor: Sumitomo, Toshiba
1350 lm of Ø 3500mm BONNA pipes & fittings Ø 3500mm & 2600mm.
Working pressure: 4 bars.
Tee reducer Ø 3500/2600/2600mm,
Weight: approximately 42 tons.


Indonesia - Bili Bili Water Transportation (Ujung Pandang) - 1996
Owner: Ministry of Public Works, Directorate General of Water Resources Development.
Contractor: Nindya Karya - Ret-Ser Joint Operation.
Prestressed Concrete Pipes. Raw Water Transmission Line (7km). Ø 1650mm & 1500mm.
Working pressure: from 3.5 to 6.5 bars.


Malaysia - Melaka Power Plant - 1996
Client: Tenaga National Berhad
Consortium Projass Mudajaya Joint Venture
Laying Contractor: Kier
BONNA pipe Ø 2200mm for the sea water intake and outfall, both off-shore.


Indonesia - Tambak Lorok Power Plant (Semarang) - 1995
Client: Sumitomo Corporation
Owner: PLN for Block I Phase II and Block II
BONNA pipe Ø 2600mm.


Malaysia - Paka Conversion Project - 1995
Client: Tenaga Nasional Berhad
Consortium: Daelim - Sumitomo - Ansaldo
Laying Contractor: Kier
2.5 km of BONNA pipes and fittings Ø 2200mm for the sea water intake and the outfall of the Paka power station in Malaysia. Installation underwater of on-shore pre-assembled pipelines sections (welding and concrete jointing).
Maximal working pressure: 5.5 bars.


Hong Kong - Black Point Power Plant - 1993 & 1994
BONNA pipes and fittings for the Cooling Water Intake System of Black Point power station in Hong-Kong.
Client: Castle Peak Power Co., Ltd.
Project Manager: China Light and Power Co., Ltd.
Consultion Engineers: Mouchel.
Installation: Maeda-CSCEC Joint Venture.
5400 lm of BONNA pipe Ø 1800mm (working pressure 4 bars, field test pressure 5 bars).