Bonna Indonesia References


THAILAND - NONG SAENG POWER PLANT 2012
Owner: GULF ENERGY
Client:MHI (Japan)
BONNA pipes for water cooling system of power plant, total length 269 m, Ø 2600mm & 1800mm. Working Pressure 2.9 bars, FTP 7.0 bars



Philippines - Batangas Power Plant 2012
Owner: PETRON
Client:CCT - TOYO Consortium
BONNA pipes for water cooling system of power plant total length 275m, Ø 2600 includes Intake Head structure.



Indonesia - Adipala,Cilacap (Central Java) Power Plant 2011
Owner: PLN (Indonesia Power Company)
Client:CNTIC
BONNA pipes for water cooling system of power plant, total length 220 m Ø 3500 & 1000 mm. Working Pressure 3 bars



Indonesia - Merak (West Java) Power Plant 2011
Owner: PLN (Indonesia Power Company)
Client:Daewoo Engineering
BONNA pipes and specials, total length 220 m for the power plant Ø 2100 to 1400 mm



Indonesia - Tanjung Awar Awar (East Java) Power Plant 2010
Owner: PLN (Indonesia Power Company)
Client:CNEEC (China)
BONNA pipes and specials for the power plant Ø 2600 to 2000 mm



New Caledonia - Koniambo Marine Outfall 2010
Owner: Koniambo Nickel SA
Client: GEOCEAN SAS
Anchor block for 7 km offshore PEHD pipeline, BONNA pipes Ø 700 mm.


China - Taishan phase 1 & 2 - 2 x 1600 MW 3rd Generation EPR Nuclear Power Plant 2009-2010
Client:JV CGNPC-AREVA(China)
Installation: 33rd Construction Company
BONNA pipes and specials for the Security system for each nuclear reactor Ø 1200 to 900 mm, Field Testing Pressure 7.0 bars.


Indonesia - Pelabuhan Ratu (West Java) 2010
Owner: PLN (Indonesia Power Company)
Client: Truba Jaya Engineering for BOT lead by Shanghai Electric (China)
Installer: WIKA (Indonesia)
General Contractor: Truba
BONNA pipe and specials for water cooling system of power plant Ø 2800-2200m, total length 1800m, Working pressure 1.5 bars.



Indonesia - Tanjung Priok (West Java) 2009
Owner: PLN (Indonesia Power Company)
Client: Mitsubishi Heavy Industry (Japan)
Installer: WIKA (Indonesia)
BONNA pipe and specials for water cooling system of power plant Ø 3200, 2300-2200 m, total length 1800 m, Working pressure 3.5 bars.


Thailand - Glow phase 5 project,2009
Owner: Glow Energy (JV Suez France)
Client: Black & Veatch (USA)
BONNA pipe and specials for water cooling system of power plant Ø 2400-2100 mm, total length 650 m, Working pressure 4 bars, FTP 4.8 bars.


Indonesia - Tanjung Jati Extension (Central Java) 2008 & 2009
Owner: Sumitomo
Client: Toshiba (Japan)
Engineering: TSB (Japan)
Installer: TSB/MES/TPSC (Japan)
BONNA pipe and specials for water cooling system of power plant Ø 3500-2200 mm, total length 1700 m, Working pressure 4 bars, FTP 4.8 bars.



Indonesia - Manado(North Sulawesi) Power plant 2008 & 2009
Owner: PLN (Indonesia Power Company)
Client: WIKA
BONNA pipes and special for the cooling system of the power plants Ø 1400,900 and 700 mm, FTP 3 bars, MWP 2 bars


Vietnam - Ca Mau 1 & 2 750 MW Power Plant - 2006 & 2007
Client: Petrovietnam.
Installation: Torishima Japan
BONNA pipes and special seismic movement compensator for the cooling system of the power plants Ø 2200 to 500mm, field testing pressure 7.2 bars.


Indonesia - Cilegon (Banten) Power Plant - 2004
Client: Mitsubshi Heavy Industry (Japan)
Discharge line of the Cilegon power station. BONNA pipe Ø 3500 mm. Working Pressure: 3 bars.


Singapore - Tuas Units 3 & 4 Power plant - 2003
Client: Mitsubishi
Tuas power station. Working pressure: 3 bars. Ø 2600 mm to 1500 mm of BONNA Pipes. Transition piece square to round 2500 mm.


Vietnam - Phu My 2-2 Power Plant - 2002
Client: Electricite de France
Cooling system of Phu My 2-2 Power Station. Ø 1800 mm BONNA pipes and fittings Ø 700 mm. Working pressure: 4 bars.


Indonesia - PT. Rekayasa Industri - 2001
Stainless steel settlement compensator Ø 1400 mm for Popka Site (Bontang,East Kalimantan,Indonesia).


Malaysia - Panglima Power Plant - 2001 & 2002


Owner: Panglima Power Snd Bhd
Engineering and Construction: Kita Tanega Sdn Bhd
Contractor: Siemens - Ballast Needam
BONNA pipe.
On shore: Ø 1800 mm,2000 mm,2500 mm with internal pressure from 1 to 6 bars. Off shore: Strings of 3 pipes (design by BONNA) 4800 lm of BONNA pipes Ø 2500 & 2200 mm.


Indonesia - Kaltim 4 - Fertilizer Plant (Bontang,East Kalimantan) - 2000
Owner: PT. Pupuk Kalimantan Timur
Engineering and Construction: PT. Rekayasa Industri
Sea water underground system: BONNA pipes
Ø 1500, 900, 800, 600, 500, and 400 mm.
Working pressures: 7 bars (supply lines).


Indonesia - Merak (West Java) - 1998
Owner: PT. Stryrindo Mono Indonesia
Client: Mitsubishi Heavy Industries
Cooling Sea Water Lines: BONNA Pipe
Ø 900mm. Working pressure: 5 bars.


Indonesia - Sidoarjo Water Treatment Plant (East Java) - 1998
Owner: PT.Taman Tirta Sidoarjo
Raw Water Lines: BONNA pipes Ø 500 and 600 mm.
Working pressure: 2 bars.


Indonesia - Amjos Ammonia Plant (Bontang,East Kalimantan) - 1998
Owner: PT. Pupuk Pasifik Amonia
Cooling Sea Water: One contract with PT. Rekayasa Industri, one with Mitsubishi Heavy Industries. BONNA pipes Ø 1500 and 500mm.
Working pressure for supply line 7 bars, working pressure for the return line 3 bars.


Indonesia - Misi Pulp Mill (South Sumatra) - 1998
Owner: PT. Tanjung Enim Lestari
Client: Holland-Ballast-Thiess Joint Operation
Raw water lines: BONNA pipes Ø 900, 1100, 1500, and 2100 mm.
Working pressures: 10 bars, 6 bars & 1 bar.


China - Laibin Power Plant - 1997 & 1998
Client: Electricite de France
2km of BONNA pipe Ø 2100 mm.
Working pressure: 6,5 bars.


Indonesia - Popka Urea Plant Bontang (East Kalimantan)
Cooling sea water lines for the Kaltim Urea Optimization Project.
Owner: Pupuk Kalimantan Timur.
Engineering and Construction: PT. Rekayasa Industri
Scope: 1750mm of BONNA pipes Ø 400, 600, 900, 1000, 1400, and 2200 mm.
Working Pressure: 7 bars for supply lines and 3 bars for return lines.


Indonesia - Tanjung Jati B Power Plant, Jepara (Central Java) 1997, 1998, 2003 & 2004
Contractor: Sumitomo, Toshiba
1350 lm of Ø 3500 mm BONNA pipes & fittings Ø 3500 mm & 2600 mm.
Working pressure: 4 bars.
Tee reducer Ø 3500/2600/2600 mm,
Weight: approximately 42 tons.


Indonesia - Bili Bili Water Transportation (Ujung Pandang, South Sulawesi) 1996
Owner: Ministry of Public Works, Directorat General of Water Resources Development.
Contractor: Nindya Karya - Ret-Ser Joint Operation.
Prestressed Concrete Pipes. Raw Water Transmission Line (7km). Ø 1650 mm & 1500 mm.
Working pressure: from 3.5 to 6.5 bars.


Malaysia - Melaka Power Plant - 1996
Client: Tenaga National Berhad
Consortium Projass Mudajaya Joint Venture
Laying Contractor: Kier
BONNA pipe Ø 2200mm for the sea water intake and outfall, both off-shore.


Indonesia - Tambak Lorok Power Plant (Semarang, Central Java) - 1995
Client: Sumitomo Corporation
Owner: PLN for Block I Phase II and Block II
BONNA pipe Ø 2600 mm.


Malaysia - Paka Conversion Project - 1995
Client: Tenaga Nasional Berhad
Consortium: Daelim - Sumitomo - Ansaldo
Laying Contractor: Kier
2.5 km of BONNA pipes and fittings Ø 2200mm for the sea water intake and the outfall of the Paka power station in Malaysia. Installation underwater of on-shore pre-assembled pipelines sections (welding and concrete jointing).
Maximal working pressure: 5.5 bars.


Hong Kong - Black Point Power Plant - 1993 & 1994
BONNA pipes and fittings for the Cooling Water Intake System of Black Point power station in Hong-Kong.
Client: Castle Peak Power Co., Ltd.
Project Manager: China Light and Power Co.,Ltd.
Consultion Engineers: Mouchel.
Installation: Maeda-CSCEC Joint Venture.
5400 lm of BONNA pipe Ø 1800 mm (working pressure 4 bars, field test pressure 5 bars).